Contracting authority: TOTAL
Prime contractor: SAIPEM – Stolt offshore
Place: Angola
Description: the Girassol project is an exceptional technological success in terms of the size of the deposit, the depth of the water, and the degree of innovation required to exploit the reserves. Girassol is situated 1400 m below the surface and 150 km from the Angolan coast, between Soyo and Luanda.
MESLI CONSULTING was contacted by SAIPEM for our project management expertise and hired specifically for the compilation of subcontractor data, project planning in PRIMAVERA, and customer reporting.